Overview of flagship projects by NLT Group as a technical infrastructure construction contractor

Các dự án tiêu biểu của nhà thầu xây dựng hạ tầng kỹ thuật NLT Group

A technical infrastructure construction contractor plays a decisive role in a project’s operational efficiency, long term operating costs, and overall asset value. In practice, contractor capability is not proven through brochures or company profiles, but through projects that have been successfully delivered. This article consolidates representative projects implemented by NLT Group, a technical infrastructure construction contractor, clarifying project scale, scope of work, and actual handover outcomes. The content provides an objective and practical reference for investors, project management teams, and related stakeholders when assessing contractor capability.

Capability of NLT Group as a technical infrastructure construction contractor

Scope of construction works

NLT Group participates in the implementation of core technical infrastructure works that directly support long term operation and utilization of projects. These works are organized with a synchronized approach to ensure stable system performance while minimizing conflicts and unforeseen issues during operation.

Nhà thầu xây dựng hạ tầng kỹ thuật NLT Group triển khai đa hạng mục cho các dự án
NLT Group delivers multi scope technical infrastructure packages across various projects

Typical technical infrastructure scopes include:

  • Site grading and ground treatment: Elevation planning, surface drainage, and ground reinforcement to ensure stable foundations for subsequent construction and infrastructure works.
  • Internal traffic infrastructure: Construction of internal roads, access routes, and related elements to ensure safe and convenient circulation during project operation.
  • Water supply systems: Deployment of water supply networks serving residential, production, or service needs, meeting requirements for flow capacity, pressure, and operational stability.
  • Stormwater and wastewater drainage systems: Effective collection and drainage solutions to prevent flooding and ensure compliance with technical and environmental requirements throughout the project lifecycle.
  • Infrastructure lighting systems: Installation of lighting for roads, public spaces, and technical infrastructure areas to support safety and nighttime operation.
  • Supporting technical infrastructure: Additional technical works required to complete the overall infrastructure system, ensuring long term synchronization and operational efficiency.

The scope of work is flexibly adjusted by NLT Group based on project scale and characteristics to meet technical requirements, schedule commitments, and operational standards expected from a professional technical infrastructure contractor.

>> See more: Technical infrastructure construction solutions and products by NLT Group

Project implementation process

Step 1 – Site survey and project requirement intake: Assessment of site conditions, collection of technical data, and understanding project scale, objectives, and standards.

Step 2 – Infrastructure planning and implementation strategy: Development of an overall construction approach, defining scope, sequencing, and key technical milestones suitable to project conditions.

Step 3 – Construction preparation and resource organization: Completion of necessary prerequisites including manpower, equipment, materials, and on site coordination planning.

Step 4 – Phased construction execution: Implementation of technical infrastructure works according to approved sequencing, ensuring coordinated integration among systems.

Step 5 – Quality, schedule, and safety control: Continuous monitoring, inspection, and adjustment throughout construction to meet technical requirements, schedule targets, and safety standards.

Step 6 – Inspection and handover of technical infrastructure works: Formal acceptance and handover in compliance with applicable regulations upon completion.

Step 7 – Post handover technical support: Coordination with investors and operators during the initial operation phase to ensure stable infrastructure performance.

Đội ngũ kỹ sư nhà thầu xây dựng hạ tầng kỹ thuật NLT Group phối hợp lập kế hoạch và phương án triển khai cho dự án
NLT Group’s engineering team coordinating planning and implementation strategies for technical infrastructure projects

Advantages of working with NLT Group as a technical infrastructure contractor

  • Holistic infrastructure mindset: Infrastructure systems are planned with long term operational logic, ensuring connectivity between components and minimizing technical risks during operation.
  • Experience across diverse project types: Proven track record in multiple project categories enables flexible adaptation to varied technical requirements and site conditions.
  • Schedule, quality, and safety control: Structured construction management processes ensure adherence to timelines, technical quality, and occupational safety standards.
  • Strong understanding of local market and execution conditions: Solutions balance international standards with practical suitability for specific project environments.
  • Effective coordination with investors and project management teams: Clear and transparent technical communication supports timely resolution of on site issues.
  • Compliance with technical standards and regulations: Infrastructure works are executed in accordance with applicable codes, facilitating inspection, acceptance, and commissioning.
  • Post handover technical support: Continued coordination after completion ensures infrastructure systems operate reliably during early stages of use.

Summary of representative projects by NLT Group as a technical infrastructure construction contractor

ECO GRAND model rural residential area project

This is a residential technical infrastructure project focused on organizing essential infrastructure systems to support daily living, mobility, and the long term sustainable development of the local community.

Dự án khu dân cư nông thôn kiểu mẫu ECO GRAND LAND, Di Linh, Lâm Đồng
ECO GRAND LAND model rural residential area project, Di Linh, Lam Dong
  • Project name: ECO GRAND LAND model rural residential area
  • Location: Hamlet 8, Gia Hiep Commune, Di Linh District, Lam Dong Province
  • Scope of work: Internal traffic infrastructure, water supply and drainage systems, power supply and lighting systems, and core technical infrastructure serving the residential area
  • Scale: Total area of approximately 46.25 hectares, including 1,446 residential land plots. The project is synchronously planned with residential zones, commercial and service areas, green spaces, public facilities, and technical infrastructure systems serving a population of approximately 3,300 people.
  • Handover results: All technical infrastructure works were completed on schedule in accordance with the implementation plan and accepted in compliance with regulations. The infrastructure system ensures construction quality and synchronization among traffic, water supply, drainage, and lighting components. After handover, the infrastructure has operated stably, effectively meeting residents’ living needs and facilitating long term management, operation, and use of the residential area.

Sugarcane juice and agricultural beverage manufacturing plant – Tay Ninh

This project belongs to the industrial technical infrastructure category, requiring high stability and continuous operational capability for factory operations.

Dự án Nhà máy sản xuất nước mía & thức uống từ nông sản Thành Thành Công, Tây Ninh
Thanh Thanh Cong agricultural processing complex sugarcane juice and beverage factory, Tay Ninh
  • Project name: Sugarcane juice and agricultural beverage manufacturing plant under the Thanh Thanh Cong Bien Hoa Agricultural Processing Complex
  • Location: Nam Ben Soi Hamlet, Thanh Long Commune, Chau Thanh District, Tay Ninh Province
  • Scope of work: Site grading, internal traffic infrastructure, and technical water supply and drainage systems serving production activities
  • Scale: An industrial manufacturing facility developed on a centralized production site, with technical infrastructure supporting continuous operation of agricultural processing lines
  • Handover results: The technical infrastructure system was completed in accordance with the agreed schedule, accepted in compliance with technical requirements, and handed over with complete acceptance documentation. The infrastructure ensures stable operation and fully meets the continuous production demands and industrial processes of the factory.

Long Hai infrastructure project, Ba Ria Vung Tau

This is a technical infrastructure project implemented in a coastal environment, directly affected by natural conditions and requiring appropriate infrastructure solutions to ensure durability and long term operational performance.

Dự án hạ tầng kỹ thuật khu vực Long Hải, Vũng Tàu
Long Hai technical infrastructure project, Ba Ria Vung Tau
  • Project name: Long Hai area technical infrastructure works
  • Location: Long Hai Town, Long Dien District, Ba Ria Vung Tau Province
  • Scope of work: Traffic infrastructure, drainage systems, and related technical infrastructure works serving residential and service development areas
  • Scale: Implemented across the Long Hai coastal area to support traffic connectivity, drainage, and completion of technical infrastructure for urban and service development under coastal environmental conditions
  • Handover results: All technical infrastructure works were completed on schedule and accepted in accordance with regulations. The project ensures construction quality, effective drainage capability, and durability suitable for coastal natural conditions. After handover, the infrastructure has operated stably, contributing to safety and long term efficiency for the area.

KING SEA premium integrated resort, Phan Thiet

This project falls under technical infrastructure for resort developments, requiring a balance between technical requirements, aesthetics, and tourism operations.

Dự án hạ tầng kỹ thuật Khu du lịch nghỉ dưỡng KING SEA, Phan Thiết
KING SEA Phan Thiet premium integrated resort technical infrastructure project
  • Project name: KING SEA Phan Thiet premium integrated resort technical infrastructure project
  • Location: Tien Thanh Commune, Phan Thiet City, Binh Thuan Province
  • Scope of work: Internal traffic infrastructure, water supply and drainage systems, lighting systems, and technical infrastructure works serving the resort
  • Scale: A large scale integrated resort planned with multiple resort and service functional zones, supported by a synchronized technical infrastructure system for long term tourism operation
  • Handover results: All technical infrastructure works were completed and accepted on schedule according to the implementation plan. The infrastructure system ensures construction quality, synchronization, and suitability for resort operations. After handover, the infrastructure has operated stably, providing a solid foundation for long term management, operation, and project development.

Thien Binh Minh tourism complex (Charm Resort), Ho Tram, Ba Ria Vung Tau

This is a large scale technical infrastructure project with multiple functional zones, requiring high levels of synchronization and technical coordination.

Dự án hạ tầng kỹ thuật tại KDL Thiên Bình Minh (Charm Resort), Vũng Tàu
Charm Resort Ho Tram technical infrastructure project
  • Project name: Charm Resort Ho Tram
  • Location: Ho Tram, Xuyen Moc District, Ba Ria Vung Tau Province
  • Scope of work: Traffic infrastructure, water supply and drainage systems, lighting systems, and technical infrastructure works serving multiple functional zones
  • Scale: Resort project with a total area of approximately 50 hectares and nearly 4 kilometers of coastline, organized into multiple major functional zones with high requirements for synchronized infrastructure and comprehensive operational capability
  • Handover results: Technical infrastructure works were completed in phases, accepted in compliance with regulations, and aligned with the overall project schedule. The infrastructure meets quality requirements, ensures synchronization among zones, and supports stable operation, forming a strong foundation for management, exploitation, and development of a large scale resort.

Go Sao residential area, Thanh Xuan Ward, District 12, Ho Chi Minh City

This project belongs to the category of technical infrastructure within an existing urban area, requiring strict construction organization and safety control.

Dự án hạ tầng kỹ thuật khu vực Long Hải, Vũng Tàu
Go Sao residential area technical infrastructure project
  • Project name: Go Sao housing area
  • Location: Thanh Xuan Ward, District 12, Ho Chi Minh City
  • Scope of work: Internal traffic infrastructure, water supply and drainage systems, and related technical infrastructure works serving the residential area
  • Scale: Residential technical infrastructure project implemented within an existing urban area, with a scale suitable to site conditions and construction space, meeting living, mobility, and infrastructure connection needs of the local community
  • Handover results: All technical infrastructure works were completed on schedule, fully accepted in accordance with regulations, and met construction quality requirements. After handover, the infrastructure has operated stably, ensuring safety, suitability for urban conditions, and effective long term management and use.

Contact NLT Group as a technical infrastructure construction contractor

NLT Group - nhà thầu xây dựng hạ tầng kỹ thuật hàng đầu Việt Nam
NLT Group – a leading technical infrastructure construction contractor in Vietnam

As a technical infrastructure construction contractor, NLT Group possesses the capability to implement synchronized infrastructure packages, supported by extensive hands on experience across large scale projects and a professionally trained engineering and technical team. NLT Group is positioned to meet strict requirements for schedule, quality, and long term operational performance.With a project approach grounded in actual site conditions, technical standards, and operational objectives, NLT Group is a suitable partner for residential, industrial, resort, and urban infrastructure projects.

NLT Group welcomes investors, partners, organizations, and enterprises interested in its capabilities, solutions, and cooperation orientation to contact directly for detailed discussions. NLT Group is committed to accompanying partners in the development and implementation of projects with long term value, aligned with practical requirements and phased development goals.

Nam Long Technology Investment Group (NLT Group)

  • Hotline: 0911 379 581
  • Email: kinhdoanh@nlt-group.com
  • TIN: 0313339640
  • Address: 43T Ho Van Hue Street, Duc Nhuan Ward, Ho Chi Minh City

Leave a Reply

Your email address will not be published. Required fields are marked *